Projects

Projects

PDS NoName of the ProjectLocationFunding AgencyExecuting Agency / ClientProject Duration
1Environmental Impact Assessment (EIA) for Conversion of Meter Gauge Line into Dual Gauge from Parbatipur to Kaunia SectionDinajpur and Rangpur LOCBangladesh Railway Nov-23 – Present
2Implementation Support to Environment and Social Safeguard Consultancy Services (Package # SP-04 of Western Economic Corridor and Regional Enhancement (WeCARE) Program of LGED. (ESIA, ESMP, SEP, GBV, SEA-SH, LAP, RAP, and Implementation of RAP and ESMP.18 Upazilas under 4 Districts (Jashore, Magura, Chuadanga and Jhenaidah) of Bangladesh (16 Procurement Packages) IDA (Cr. No. 6684-BD) World Bank LGEDMarch 01, 2022-August 31, 2024
3Consulting Services for Situation Analysis of the Sustainable Micro-Enterprise and Resilient Transformation (SMART) Project of Palli Karma-Sahayak Foundation (PKSF) All over country PKSFPalli Karma-Sahayak Foundation (PKSF) July 2024 –August 2024
4Environmental and Social Due Diligence (ESDD) Report and Initial Environmental Examination (IEE) of BRAC University of Bangladesh. Merul-Badda, Dhaka, Bangladesh IDCOLIDCOLJuly 2023 - February 2024
5Update of IEE and Environmental & Social Impact Assessment (ESIA) study, stakeholder consultation, assessment and Quarterly Environmental Monitoring, Test Analysis. Merul-Badda, Dhaka, Bangladesh IDCOLBRACUOct 23 to Nov 23
6IEE of Laying of Optical Fiber Submarine Cable at Cox’s Bazar and obtaining Site and Environmental Certificate. Cox’s Bazar Deep SeaBSCCLBangladesh Submarine Cable Company Ltd, (BSCCL)May 23 to Sep 24
7Resettlement Plan (RP) for Approach Channel at Old Brahmaputra River and Adjacent Connecting Road to Project Site under Mymensingh 420 MW Dual Fuel (Gas/HSD) Combined Cycle Power Plant ProjectSambhugonj, Mymensingh Power StationRPCL/ GoBEMPRESARIOS AGRUPADOS and IRG Development Services Ltd. Nov 2022 Sep 23
8EIA and EMP of Automation of Main Installations of Three Oil Marketing Companies Padma Oil Company Ltd. at Patenga, Chattogram, Bangladesh.Potenga, ChattogramGoBBangladesh Petroleum Corporation (BPC)May 22 to present
9EIA and EMP of Automation of Main Installations of Three Oil Marketing Companies Jamuna Oil Company Ltd. at Patenga, Chattogram, Bangladesh.Potenga, ChattogramGoBBangladesh Petroleum Corporation (BPC)May 22 to present
10EIA and EMP of Automation of Main Installations of Three Oil Marketing Companies Meghna Petroleum Ltd. at Patenga, Chattogram, Bangladesh.Potenga, ChattogramGoBBangladesh Petroleum Corporation (BPC)May 22 to present
11Elephant Conservation & Human Elephant Conflict Resolution” under the SUFAL Project (SD 40).Cox’s Bazar, Moulavi Bazar & Sherpur districtsGoBBangladesh Forest Department (BFD)Oct 21-Present
12Feasibility study of Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) Study of Khulna Agricultural University (KAU) at Khulna. Khulna , BangladeshGoBKhulna Agricultural University Jun 21-Sep 21
13ESIA study of CAPEX/BMRE for upgrading and modernization of existing core network infrastructure and strengthening overall network capacity by Robi Axiata Limited (Robi).Whole BangladeshIDCOLRobi Axiata Ltd. (Robi)Jul 20-Feb 22
14Environment and Social Impact Assessment (ESIA) for constructing 12 Storied Building of Janata Tower Software Technology Park (STP-2).Kawran Bazar C/A, Dhaka.GoBBangladesh Hi-Tech Park Authority (BHTPA) October 19 to Jan 20
15Environmental Assessment (EA) of Chattogram Software Technology Park (CSTP)Agrabad on which Singapore-Bangkok MarketGoBBangladesh Hi-Tech Park Authority (BHTPA)April 19 to Nov.19
16Environmental Assessment (EA) of Rajshahi ICT Cum Incubator Training CenterNabinagar mouza of Paba upazila at Rajshahi districtGoBBangladesh Hi-Tech Park Authority (BHTPA)April 19 to Nov. 19
17Environmental & Social Impact Assessment (ESIA) Study of Asian University for Women Support Foundation (AUWSF).Chattagram, BangladeshWBAsian University for Women support Foundation (AUWSF). WB Funded Feb 19-Jan 20
18IEE and Environmental Impact Assessment (EIA) Study of Panigram Resort Ltd. Jashore, BangladeshPrivatePanigram Resort Ltd.Mar 12-Feb 13
19IEE and EIA Including EMP study for obtaining Site Clearance Certificate (SCC) and Environmental Clearance Certificate (ECC) From DoE, Bheramara 110 MW HSD based Rental power plant.Bheramara, Kushtia, Bangladesh.Quantum Power System Ltd.Quantum Power System Ltd.Mar 10-May 11
20IEE and EIA Including EMP study for obtaining Site Clearance Certificate (SCC) and Environmental Clearance Certificate (ECC) From DoE, Noapara 105 MW HFO based Rental power plant.Noapara, JessoreQuantum Power System Ltd.Quantum Power System Ltd.Mar 10-Apr 12
21Initial Environmental Examination (IEE) & Social Environmental Impact Assessment (SEIA) & Environmental Monitoring studies Bibiyana South 768 MW Combined Cycle Power Plant.Habiganj, BangladeshBibiyana South Cycle Power Plant.Bibiyana South Cycle Power Plant.Mar 10 To Nov 11
22Environmental Monitoring (Air, Noise, S.W, G.W) of 335MW Combined Cycle Gas Turbine (CCGT) Plant power project. Phase II is under Initial Environmental Examination (IEE) & Social Environmental Impact Assessment (SEIA) study.Meghna Ghat, BangladeshBPDBBPDBJul 14 To Jun 15
23Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) studies ECPV Chittagong Ltd. 108 MW HFO Power Plant has obtained Site Clearance and Environmental Clearance Certificates from the Department of Environment (DoE)Chittagong, BangladeshECPV Chittagong LimitedECPV Chittagong LimitedNov 11-Sep 11
24Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) studies Katakhali 50 MW HFO Based Power Plant, obtaining Site Clearance and Environmental Clearance Certificates from the Department of Environment (DoE)Katakhali, RajshahiNorthern Power System Ltd.Northern Power System Ltd.Mar 10-Apr 11
25Environmental impact assessment including a monitoring and management plan, preparation of EIA report of Shahjibazar 60MW Gas Turbine Power Plant Project ShahjibazarBangladesh Power Development Board.Bangladesh Power Development Board.Jan 01-Feb 01
26Environmental impact assessment (EIA) study of 141 KWP solar-diesel hybrid power system for off-grid Paratoli union of Raipura, NarshindiNarshindi, BangladeshShouro Bangla Ltd.Shouro Bangla Ltd.Mar 14 Jun 14
27Environmental Study of Installation of a 7.5 MW Off-Grid Wind-Solar Hybrid System with Diesel Generator in Hatiya, Noakhali.Hatia, Noakhali.Power Development Board (PDB)Power Development Board (PDB)Apr 13-Sep 13
28Implementation of EMP and Environmental monitoring of EMP of Siddirganj 335 MW Combined Cycle Power Plant ProjectSiddhirganj, Narayanganj BangladeshWBEGCBJun 14 -Jul 15
29Ghorashal Unit 4 Re Powering Project.Ghorashal, NarshingdiWBBPDBApr 17-Dec 17
30Ambient Noise Level Measurement and Analysis of Ashuganj 450 MW CCPP (NORTH)Ashuganj, B-Baria-3402ADBAPSCL24th 17-31st May 17
31Natural Gas Testing and Analysis of Ashuganj 450 MW CCPP (NORTH)Ashuganj, B-Baria-3402ADB APSCLMay 17- Jul 17
32Environmental Monitoring Noise of 7.5 MW Off-Grid Wind – Solar Hybrid System with Diesel Generator in Hatiya, Noakhali.Hatiya, NoakhaliBPDBBPDBAug 14-Sep 14
33Environmental Impact Assessment (EIA), Social and Resettlement Action Plan (RAP) of Extension of Gas Distribution Network.Bhola, BangladeshSGCLADBMay 15 - Sep 15
34IEE, EIA, SIA and RAP study for feasibility study of PGCB’s Transmission System Improvement in West Zone Part - 3West Zone, BangladeshWBPGCBApr 14 –Jul 15
35IEE and ESIA of Construction of new 230 kv double circuit T/L Ishurdi- Rajshahi 230 kV In-Out for Jhinnaildaha 230 kV Substation Construction of new 132 kV double circuit T/L Gopalganj - Khulna South Construction of new 132 kV double circuit T/L Baghabari- Bhangura 132 kV double circuit In - Out connection for Pansha (Rajbari) New 132/33 kV S/S MithapukurGreater Rajshahi, Jhinaiddaha, Gopalganj, Khulna Shahzadpur, Sherajgonj, Pabna, Rajbari, Rangpur, Union, Sathi Bari Upazella,Mithapukur Mouza: KathaliWBPGCBApr 14- Jan 15
36Consultancy Services for Route Survey with IEE, RAP Study & Topographical Survey of “Modhunaghat-Moheshkhali and Modhunaghat-Bhulta 765Kv Transmission Line ProjectModhunaghat-Moheshkhali and BhultaWBPGCBDec 18- May 19
37Environmental & Social Impact Assessment (ESIA) Study of Sena Edible Oil Industries Ltd.Narayangonj, BangladeshSena Edible Oil Industries Ltd.Sena Edible Oil Industries Ltd.Jan 19-Nov 19
38Environmental & Social Impact Assessment (ESIA) Study of Seven Ring CementGazipur, Dhaka BangladeshIDCOLShun Shing GroupDec 18-June 20
39Environmental & Social Impact Assessment (ESIA) Study of Shun Shing CementGazipur, Dhaka BangladeshIDCOLShun Shing GroupDec 18-May 19
40EIA of Basundhara Cement Industries Ltd.Meghnaghat, NarayangonjBashundhara GroupBashundhara GroupJan 10- May 11
41EIA Study of Gazi Cement Mills Ltd. Palash, NarshindiGazi GroupGazi GroupJan 07 to Apr 08
42Environmental and Social Due Diligence (ESDD) report of Doreen Hotels and Doreen Suites ProjectGulshan-2, Dhaka, BangladeshIDCOL/ ADBDoreen Hotels and Resorts Ltd. Oct 21-Nov 21
43Water supply and central wastewater treatment (CETP) 1,166 m3/hr and design of Abdul Monem Economic Zone Ltd. (AMEZ) Munshigonj, AMEZAbdul Monem Ltd. Abdul Monem Ltd. June 15- Dec 15
44Technical assistance for the BEPZA Comilla CETP (625m3/hr) project, Funded by IDCOL.Comilla EPZIDCOLIDCOLDec 12- Jan 13
45Technical assistance for the BEPZA CETP projects at Dhaka (625 m3/hr.) and Chittagong EPZ CETP (1,166 m3/hr.)Dhaka & Chittagong EPZ< BangladeshIFCIFCMar 11- Mar 12
46External Training Coordinator, Management of CETPs (Maximum capacity 2,300 m3/hr. at Vapi, Gujrat) in IIT Powai, Mumbai, India, ECLMumbai and Gujrat, IndiaIFCIFCOct 11- Nov 11
47IEE, EIA, EMP of CETP (300 m3/hour) of Thermax Group of industriesNarsingdi, BangladeshThermax Group of industriesThermax Group of industriesOct 08 -Feb 09
48Designing an integrated package of PPP options for industrial wastewater treatment (CETP) and reuse in greater DhakaDhaka, Gazipur, Narayangonj, NasingdiWorld BankWorld BankAug 09- Jan 10
49Environmental and Social Impact Assessment for the Northern Areas Poverty Reduction Initiative (NARI) ProjectDhaka EPZ, Karnaphuli EPZ in Chittagong, & Ishwardi EPZ.IFCIFCJan 11-Jun 11
50Strengthening Monitoring and Enforcement in the Megha River for Dhaka’s Sustainable Water Supply. PTA-42173-014-Ban:Meghna River BangladeshGoBADB/DoENov 15- Dec 18
51PBE4S16022 (Deltares#120919 Innovative Monitoring and Reporting for Sustainable Water Quality of Meghna RiverMeghna River, BangladeshGoBADB/DoE Feb 17-Dec 18
52Updating of EIA study (Intake structure, raw water transmission, treatment plant, treated water transmission and distribution, River and road crossing, Wastewater and sludge management.), Geotechnical investigation for borehole drilling for pipe installation, EMMP and preparing comprehensive EIA reportBisnandi point of Meghna river to UttaraDhaka WASAGoBAug 17- May 18
53Field history of aquifer study, Identify the Bore well location, DTW drilling, aquifer and suitable water quality layer, soil and water testing, Overall supervision, preparation of bore log, design and construction of TWRajshahi, BangladeshACI Godrej (India) Agrovet Private Ltd. ACI Godrej (India) Agrovet Private Ltd. Apr-Sep15
54EIA, EMP, ETP treatability study of United Sugar Mills Ltd. Design, drawing, and supervision of Civil, E/M equipment installation of 10m3/hr ETP of United Sugar Mills Ltd. turnkey projectMeghnaghat, Sonargaon, NarayangonjMeghna group of industries (MGI)Meghna group of industries (MGI)May 09 - Jul 10
55Preparation of IEE report for site clearance, EIA report for Environmental clearance from DOE and design, drawing supervision of 15m3/hr ETP of Phoenix Home Textile Ltd., Tongi, BSCIC Industrial AreaPhoenix Home Textile.Phoenix Home Textile.May 08-Feb 09
56IEE, EIA for Mubarakpur Oil/Gas Exploration Well Drilling ProjectPabna , BangladeshGoBBAPEXOct 10 – Dec 12
57IEE of Bangladesh Gas Field Company LimitedBrahambaria, BangladeshGoBBGFCLJun 13-Nov 14
58Environmental Impact Assessment (EIA) of Construction of link road from Dhaka Trunk Road to Baizid Bostami Road, including loop road outer periphery of AUW project.Chattogram, BangladeshChittagong Development Authority (CDA)Chittagong Development Authority (CDA)Dec 16-Apr 17
59Feasibility Study of Environmental and Social Impact Assessment (ESIA) of Sheola, Bhomra and Thegamukh Land Port).Sheola, Sylhet, Bhomra Satkhira and Thegamukh, Rangamati World BankBangladesh Land Port Authority (BLPA)Mar 16-Oct 16
60IEE and EIA Mobarakpur Oil/Gas Exploration Well Drilling Project of BAPEX of well #1 at Paglachandipur, Khetupara, Santhia, Pabna.Pabna, BangladeshBAPEXBAPEXSep 10- March 11
61EIA of Chemical Industries of Rainbow Chemicals Ltd.BSCIC, industrial area, TangailPrivateRainbow Chemicals Ltd.Sep 2008-Feb 2008
62EIA, EMP, ETP treatability study of United Sugar Mills Ltd. Design, drawing, supervision of Civil, E/M equipment installation of 10m3/hr ETP of United Sugar Mills Ltd. turnkey projectMeghnaghat, Sonargaon, NarayangonjMeghna group of industries (MGI)Meghna group of industries (MGI)May 09 - Jul 10
63Preparation of IEE report for site clearance, EIA report for Environmental clearance from DOE and design, drawing supervision of 15m3/hr ETP of Phoenix Home Textile Ltd., Tongi, BSCIC Industrial AreaPhoenix Home Textile.Phoenix Home Textile.May 08-Feb 09
64IEE, EIA for Mubarakpur Oil/Gas Exploration Well Drilling ProjectPabna, BangladeshGoBBAPEXOct 10 – Dec 12
65Environmental Impact Assessment (EIA) of Construction of link road from Dhaka Trunk Road to Baizid Bostami Road including loop road outer periphery of AUW project.Chattogra, BangladeshChittagong Development Authority (CDA)Chittagong Development Authority (CDA)Dec 16-Apr 17
66Feasibility Study of Environmental and Social Impact Assessment (ESIA) of Sheola, Bhomra and Thegamukh Land Port).Sheola, Sylhet, Bhomra Satkhira and Thegamukh, Rangamati World BankBangladesh Land Port Authority (BLPA)Mar 16-Oct 16
67Environmental Impact Assessment (EIA) of 06 (Six) Full Fledge TV Stations of Bangladesh Television6 Division, BangladeshGoBBTVMay 17-Sep 17
68Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) of HMCL Niloy Motors Bangladesh Ltd.Jessore, BangladeshNitol Niloy GroupHMCL Niloy Bangladesh ltd.Jul 15-Jan 17
69Environmental Impact Assessment (EIA) of Tentative 11 (Eleven) nos. Bridges over the different rivers in the different districts. LGED.4 District of BangladeshGoBLGEDMay 15-Jul 15
70Design and construction supervision of ETP turnkey project Eskayef Bangladesh Ltd. Pharmaceutical Industry.Gazipur, BangladeshEskeyef Bangladesh Ltd.Eskeyef Bangladesh Ltd.Dec 07-May 08
71Preparation of Design, drawing, supervision of Construction work and electrical and mechanical installation, and commissioning of Sonargaon Dyeing & Printing Industries Ltd., ETP.Tejgaon Industrial areaSonargaon Dyeing and Printing Ltd.Sonargaon Dyeing and Printing Ltd.Mar 08- Apr 09
72Treatability study of effluent for GlaxoSmithKline Bangladesh Ltd. Pharmaceutical Industry ETP project design.Chittagong, BangladesGlaxoSmithKline Bangladesh Ltd.GlaxoSmithKline Bangladesh Ltd.Jun 09- Sep 09
73Design of ETP, drawing supervision of civil and E/M equipment installation of GlaxoSmithKline Bangladesh Ltd. Pharmaceutical Industry turnkey ETP project.ChittagongGlaxoSmithKline Bangladesh Ltd.GlaxoSmithKline Bangladesh Ltd.Oct 09 - May 10
74“Private Public Partnership Options for Industrial Wastewater Treatment and Reuse in Greater Dhaka” Jointly with Euroconsult Mott MacDonald, Finance by World Bank, Greater Dhaka AreaWorld bankWorld bankAug 09- Feb 10
75Design, draw, and supervise civil work for ETP and ETP equipment installation for Novartis Pharmaceutical Ltd. Turnkey projectCherag Ali, Tongi, GazipurNovarties Pharmaceutical Ltd.Novarties Pharmaceutical Ltd.Jun 09 - May 10
76Design and Construction Supervision of Basundhara Steel Complex Ltd., 5m3/hr ETPManikgonj, BangladeshBashundhara Steel LtdBashundhara Steel LtdApr 08 - Dec 08
77Design, drawing, and supervision of Civil work of 15m3/hr ETP, ETP equipment installation of Molla Dyeing and Printing Industries Ltd., Demra, NarayangonjMolla Dyeing and Printing Industries Ltd., Molla Dyeing and Printing Industries Ltd., May 09 - Jan 10
78Expansion of design, drawing, supervision of civil work of 100m3/hr ETP, and installation of ETP equipment for Pakiza Dyeing and Printing Industries Ltd. Savar, DhakaPakiza Dyeing and Printing Industries Ltd., Pakiza Dyeing and Printing Industries Ltd., Mar 09- Sep 09
79Design, drawing, and supervision of Civil work of 30m3/hr ETP installation of Modina Dyeing Printing and Processing Industries Ltd.,Mokterpur, MunshogonjModina Dyeing Printing and Processing Industries Ltd., Modina Dyeing Printing and Processing Industries Ltd., Jun 10 - Dec 10
80Review of Design, drawing of 150m3/hr ETP, Basundhara Newsprint and Duplex Board Industries Ltd., Sonargaon, NarayangonjBasundhara Newsprint and Duplex Board Industries Ltd., Basundhara Newsprint and Duplex Board Industries Ltd., Nov 08-Dec 08
81Review of Design, drawing of 150m3/hr ETP, Basundhara Paper Mills Ltd., Sonargaon, NarayangonjBasundhara Paper Mills Ltd., Basundhara Paper Mills Ltd., Nov 08 - Dec 08
82STP Design of Asian University for Women Support Foundation (AUWSF).Chittagong, BangladeshAsian University for Women Asian University for WomenJul 10-Oct 10
83Identification, Prioritization and Prefeasibility of Potential Projects under Roads and Highways DepartmentWhole BangladeshWorld BankWorld BankFeb 21- Dec 22
84Baseline Environmental Survey and Environmental Quality Monitoring of Greater Dhaka Sustainable Urban Transport Project (Package-2)Airport to Gazipur, BangladeshADBBRTA, RHDMay 14-Feb 15
85Construction of Road, Bridge and Culvert from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via NavagramNarayangong, DhakaRAJUK, BangladedshRAJUK, BangladeshJun 17-Nov 18
86Regional Cooperation and Integration ProjectChattogram, Cox’s Bazar ADBBangladesh RailwayNov 12- Sep 14
87Baseline Environmental Survey and Environmental Monitoring (Air, Noise, Water) of Dhaka Urban Transport Network Development Study (DHUTS) By JICAPallabi to Syedabad, DhakaJICADhaka City CorporationApr 11 –May 11
88Resettlement Plan (RP) of Gas Seepage Control and Appraisal & Development of Titas Gas FieldBrahambaria, BangladeshADBBGFCLJun 13-Sep 14
89Identification of gas seepage and its control from Titas gas field and preparation of environmental management plan (EMP) of BGFCL and Brahmanbaria.Brahambaria, BangladeshADBBGFCLApril 08-August 2009
90Master plan of climate change, environment and disaster management. 6 DistrictADBLGEDOct 17-Jan 18
91Public Private Partnership Project (PPP) titled SAVE is covered by a contract between ECCI and PUMA.Dhaka and GazipurIFCAsia Society for Social Improvement & Sustainable Transformation (ASSIST)Oct 13-Nov 13
92Conducting a Study on “Physical Environment (Waste Management)” of Microenterprises of ‘Promoting Agricultural Commercialization and Enterprises (PACE) Project’ of PKSF22 Districts in BangladeshPKSFPKSFJune 18-Nov 18
93EMP of ETP Bashundhara Steel Complex Ltd.Jagir, ManikgonjBashundhara GroupBashundhara Steel Complex Ltd.May 07-December 07
94EMP Implementation and Supervision Env. Monitoring and reporting of Siddirganj 335 MW Combined Cycle Power Plant ProjectSiddhirganj, Narayanganj BangladeshWBEGCBJun 14 -Jul 15
95EMP Implementation and Supervision Environmental Monitoring of Ashugonj 450 MW North CCGT PP.Ashuhganj Power Station Ltd. BrahmanbariaWBEGCBJun 14 -Jul 15
96EMP Implementation and reporting of Environmental Monitoring (Ambient air, stack emission, Noise, water, wastewater, Soil) of Lafarge Surma Cement Industries Ltd.Chatak, SunamganjLafarge Surma (BD) Bangladesh Ltd.Lafarge Surma (BD) Bangladesh Ltd.Apr 13-Jun 14
97EMP implementation of Environmental Quality (Ambient air, Noise, water, wastewater, Soil) monitoring of Ghorashal Unit 4 Repowering Project.Ghorashal, NarshingdiWBBPDBApr 17-Dec 19
98Industrial Environmental Audit on Textile Dyeing and Vegetable Oil Company.Tongi BSCIC l/A, Tongi l/A & NarayangoniWBIWMJu 06-Aug 06
99Environmental, Health and Safety (EHS) Audit of Meghnaghat-2 Power Plant Construction Site and Reporting.Meghnaghat-2 Power Plant, NarayangonjEUBCASNov-Dec 12
100Environmental Awareness, capacity building and environmental monitoring servicesDhaka, BangladeshMeghna Group of Industries.Meghna Group of Industries.Mar 08-Dec 08
101Environmental Awareness, capacity building and environmental monitoring servicesNarayangonj Meghna Ghat Power Ltd.Meghna Ghat Power Ltd.Feb 08-Dece 08
102External Training, Management of CETPs (Maximum capacity 2,300 m3/hr. at Vapi, Gujrat) in IIT Powai, Mumbai, India, ECLMumbai and Gujrat, IndiaIFCIFCOct 11- Nov 11
103Provide hands-on training on ETP operation, maintenance, troubleshooting, sampling and testing, occupational health and safety, reuse of treated effluent, and compliance report preparation. Chittagong, BangladeshGlaxoSmithKline Bangladesh LtdGlaxoSmithKline Bangladesh LtdOct 09 - May 10
104Quarterly Ambient Air & Ambient Noise Level monitoring of Bibiyana Gas Field, Moulibazar Gas Field, Jalalabad Gas field & Muchi Compression System Sylhet DistrictChevron Bangladesh Ltd.Chevron Bangladesh Ltd.Feb14- Present
105‘Stack Emission Monitoring of Dioxin and Furan” at Bibiyana Gas Field & Moulibazar Gas FieldSylhet DistrictChevron Bangladesh Ltd.Chevron Bangladesh Ltd.Feb 14- Present
106Incinerator Flue Gas, (SPM, SO2, NOx, CO, HCl, H2S, Pb Cd and Hg) and opacity MonitoringSylhetChevron Bangladesh Ltd.Chevron Bangladesh Ltd.Feb 14-Present
107Quarterly Ambient Air & Ambient Noise Level monitoring of the TULLOW Gas field Comilla, BangladeshKrish Energy Ltd.Krish Energy Ltd.Feb 14- Dec 18
108‘Stack Emission Monitoring of TULLOW Gas field Comilla, BangladeshKrish Energy Ltd.Krish Energy Ltd.Feb 14- Dec 18
109Weekly monitoring of Meghna River Surface Water Quality Monitoring, test analysis and preparation of reportChaitankanda, Bishnondi, Meghna RiverGoBDhaka WASAFeb 14- Jun 15
110Monthly Environmental Monitoring Lafarge Surma Cement Industries Ltd.Chatak, SunamganjLafarge Surma (BD) Bangladesh Ltd.Lafarge Surma (BD) Bangladesh Ltd.Apr 13-Jun 14
111Yearly Environmental Monitoring of Holcim Cement Industries Ltd.Meghnaghat, NarayangonjHolcim Cement (BD) Ltd.Holcim Cement (BD) Ltd.Apr 14-Oct 18
112Quarterly Environmental monitoring of Ghorashal Unit 4 Repowering Project.Ghorashal, NarshingdiWBBPDBApr 17-Dec 19
113Monthly Environmental Monitoring and Test Analysis of Siddirganj 335 MW Combined Cycle Power Plant ProjectSiddhirganj, Narayanganj BangladeshWBEGCBJun 14 -Jul 15
114Monitoring and test analysis for IEE, EIA & EMP Northern Power System Ltd. Katakhali 50 MW HFO Based Power PlantKatakhali, RajshahiNorthern Power System Ltd.Northern Power System Ltd.Mar 10-Apr 11
115Emission monitoring and DLN Tuning of RPCL 350 MW Combined Cycle Power Plant ProjectRPCL, Mymensingh GOBGESep 21-Sep 21
116Emission monitoring and DLN Tuning of 330 MW CCPP Shajibazar Power Plant Unit #2.Habigonj, SylhetGoBGENov 21-Nov 21
117Emission monitoring and DLN Tuning of Siddirganj 335 MW Combined Cycle Power Plant ProjectSiddhirganj, NarayanganjGoBEGCBJun 16- Sep 16
118Emission monitoring and DLN Tuning of Fenchuganj CCGT Power Plant.Fenchuganj, SylhetGoBBPDBGoB May 17-May 17
119Emission monitoring and DLN Tuning of Shajibazar CC Power Plant.Habigonj, SylhetGoBShahjibazar Power Co LtdJan 17-Jan 17
120Analysis of Structure for Earth Quake Assessment, Novartis Bangladesh Ltd. Cherag Ali, Tongi, GazipurTongi, GazipurNovartis Bangladesh LtdNovartis Bangladesh LtdMay-June 2010
121Design and supervision of Molla Dyeing Industries Building.Demra, NarayangonjMolla Dyeing IndustriesMolla Dyeing IndustriesJan 10-Mar 10